About Our Turbine Packages
8MW-50MW
2-trailer Design
No Crane or Forklift
Ultra Mobile
Park to Power in 12-15 Hours
No After Treatment
E-Frac
Production
Infield Power
Utility
Bitcoin
Data Centers
Processed Field Gas
CNG
LNG
Hydrogen
Liquid Fuels
About Our Turbine Packages
8MW - 50MW
2-trailer Design
No Crane or Forklift
Ultra Mobile
Park to Power in 12-15 Hours
No After Treatment
E-frac
Production
Infield Power
Utility
Bitcoin
Data Centers
Processed Field Gas
CNG
LNG
Hydrogen
Liquid Fuels
The Siemens SGT300 gas turbine is a well referenced gas turbine with hundreds of installations worldwide and capable of 7.9MW of power output. As a distinguished OEM mobile packager of the Siemens SGT300 we have professionally engineered and designed one of the largest gas turbine packaged in a single mobile trailer. This package is immediately available for purchase and has already been specified on several projects. Click below to read more about the DT8 package.
The 5.6MW package is truly unique and a testament to the driving innovative spirit that separates Dynamis from other transportable turbine power solution providers. Using the latest in transportable power technology, this packages houses the gas turbine, generator, gearbox, auxiliary equipment, black start, transformer, filtered air & exhaust systems all in a single trailer. For transport, the structural truss trailer and its 6 axle dolly provides superior mobility and quick deployments. All of the Dynamis gas turbine packages are the results of creative custom engineering.
Dynamis’ most powerful transportable solution, the 35MW package design utilizes only two trailers for transport and operations. Our innovative design allows for greater flexibility by eliminating the need for a crane or forklift onsite during mobilization and demobilization. This provides Dynamis the unrivaled capability of deployment and mobilization for reliable power in as little as 14 hours. The LM2500+G4 turbine exhibits a 25,000 hour service interval vs. a diesel engine’s 8,000 hour service interval. This ultra-mobile turbine package converts field gas, CNG, or LNG into electricity resulting in a 95% fuel cost savings vs diesel.
Official OEM packager for General Electric, Siemens,
and Baker Hughes
Deployment and mobilization in less than 14 hours
One & two trailer turbine packages for transport & operations
No crane or forklift required for mobilization and demobilization
Hydraulic positioning features for the intake and exhaust trailer
Auto leveling system with hydraulic landing legs with mechanical locks
Electric turbine starter motor with a variable frequency control
Mobile power designed for any application
ARGENTINA PATENT NO. AR103160B1
AUSTRALIA PATENT NO. 2015364678
JAPAN PATENT NO. 6415748
KOREA PATENT NO. 10-1948225
KOREA PATENT NO. 10-1981198
UNITED STATES PATENT NO. 9,534,473
UNITED STATES PATENT NO. 10,374,485
Maintain operational efficiency and get consistent power for your team today!
Dynamis Power Solutions® All Rights Reserved | Privacy