Features

  • Exclusive GE OEM Mobile Packager of the LM2500+G4, LM2500 & NovaLT5 Gas Turbines
  • Deployment and mobilization in less than 14 hours
  • One & two trailer turbine packages for transport & operations
  • No crane or forklift required for mobilization and demobilization
  • Hydraulic positioning features for the intake and exhaust trailer
  • Auto leveling system with hydraulic landing legs with mechanical locks
  • Electric turbine starter motor with a variable frequency control
  • Mobile power designed for any application

Patents

  • ARGENTINA PATENT NO. AR103160B1
  • AUSTRALIA PATENT NO. 2015364678
  • JAPAN PATENT NO. 6415748
  • KOREA PATENT NO. 10-1948225
  • KOREA PATENT NO. 10-1981198
  • UNITED STATES PATENT NO. 9,534,473
  • UNITED STATES PATENT NO. 10,374,485

Contact Form

* Required Fields

Name*

Email*

Message*

Contact Info

Powering Evolution Well Services’
100% Electric-Powered Frac Fleet