Dynamis’ most powerful transportable solution, the 35MW package design utilizes only two trailers for transport and operations. Our innovative design allows for greater flexibility by eliminating the need for a crane or forklift onsite during mobilization and demobilization. This provides Dynamis the unrivaled capability of deployment and mobilization for reliable power in as little as 14 hours. The LM2500+G4 turbine exhibits a 25,000 hour service interval vs. a diesel engine’s 8,000 hour service interval. This ultra-mobile turbine package converts field gas, CNG, or LNG into electricity resulting in a 95% fuel cost savings vs diesel.
Our 23 MW turbine package offers all the same features as the 35 MW package, but utilizes GE’s LM2500 Gas Turbine for applications requiring less power. Both packages incorporate Dynamis’ auto-leveling and positioning systems, which uses hydraulic landing legs to allow for more precise maneuvering during initial mobilization. All auxiliary equipment is integrated into the truss structure of the main trailer, and the secondary trailer uses hydraulic positioning with our state-of-the-art intake and exhaust systems.
The Siemens SGT300 gas turbine is a well referenced gas turbine with hundreds of installations worldwide and capable of 7.9MW of power output. As a distinguished OEM mobile packager of the Siemens SGT300 we have professionally engineered and designed one of the largest gas turbine packaged in a single mobile trailer. This package is immediately available for purchase and has already been specified on several projects. Click below to read more about the DT8 package.
The 5.6MW package is truly unique and a testament to the driving innovative spirit that separates Dynamis from other transportable turbine power solution providers. Using the latest in transportable power technology, this packages houses the gas turbine, generator, gearbox, auxiliary equipment, black start, transformer, filtered air & exhaust systems all in a single trailer. For transport, the structural truss trailer and its 6 axle dolly provides superior mobility and quick deployments. All of the Dynamis gas turbine packages are the results of creative custom engineering.
The DE2.5 was originally designed as a backup power source for our turbine packages. Dynamis is now offering this as a natural gas or diesel mobile power package with the ability to add battery systems for increased reliability and operational flexibility.
Dynamis’ most innovative transportation solution, the DBESS package design utilizes Lithium Titanium Oxide (LTO) battery technology to deliver high power density, best in class battery cycle life and fast charge capabilities to customers seeking a highly flexible energy storage system for grid tied or island grid operations. This innovative package design provides greater flexibility for customers with the ability for charging to 80% State of Change (SOC) in 6 min for applications requiring minimal time in between charge/discharge cycles.
Official OEM packager of General Electric LM2500 gas turbines, Siemens SGT gas turbines, and Baker Hughes LT Gas Turbines
Deployment and mobilization in less than 14 hours
One & two trailer turbine packages for transport & operations
No crane or forklift required for mobilization and demobilization
Hydraulic positioning features for the intake and exhaust trailer
Auto leveling system with hydraulic landing legs with mechanical locks
Electric turbine starter motor with a variable frequency control
Mobile power designed for any application
ARGENTINA PATENT NO. AR103160B1
AUSTRALIA PATENT NO. 2015364678
JAPAN PATENT NO. 6415748
KOREA PATENT NO. 10-1948225
KOREA PATENT NO. 10-1981198
Maintain operational efficiency and get consistent power for your team today!
Dynamis Power Solutions® All Rights Reserved | Privacy